Assembly of the 9 meter drill head of the TBM tunnel boring machine at the south portal of the NEAT Gotthard, Bodio 2002.

Sheet 20020840 Photo 28

Image of sheet 20020840 photo 28: Neat Bahntunnel Gotthardbasistunnel Baustelle Suedportal AlpTransit Gotthard AG Südportal in Bodio Montage des Bohrkopfs der TBM Tunnelbohrmaschiene Firma Herrenknecht. an der Tunnelbrust Arbeiter Graffitti Schweisser unter der TBM
aus: Gotthard, das Hindernis verbindet. Kanton Tessin, Ticino, Schweiz Svizzera, Switzerland
copyright by Olivia Heussler
Color: Black & White
Type: Positive, Negative, Digital
Formats: 13x18
Country: Schweiz
Region: Bodio
Place: Tessin
Date: Mar 4, 2003
Keywords: Bahn, Transport, Tunnelbau