Assembly of the 9 meter drill head of the TBM tunnel boring machine at the south portal of the NEAT Gotthard, Bodio 2002.

Sheet 20020840 Photo 29

Image of sheet 20020840 photo 29: Neat Bahntunnel Gotthardbasistunnel Baustelle Suedportal AlpTransit Gotthard AG Südportal in Bodio Montage des 9 meter Bohrkopfs der TBM Tunnelbohrmaschine Firma Herrenknecht. an der Tunnelbrust Arbeiter
aus: Gotthard, das Hindernis verbindet. 
Kanton Tessin, Ticino, Schweiz Svizzera, Switzerland
2002 √
Color: Black & White
Type: Positive, Negative, Digital
Country: Schweiz
Region: Bodio
Place: Tessin
Date: Mar 4, 2003
Keywords: Bahn, Transport, Gotthard, Tunnelbau, NEAT, Tunnel